Return to flip book view

P605 P1100 SolarEdge Opti

Page 1

solaredge.com Power Optimizer P605 / P650 / P701 / P730 / P800p / P801 / P850 / P950 / P1100 PV power optimization at the module level The most cost-effective solution for commercial and large field installations Specifically designed to work with SolarEdge inverters High efficiency with module-level MPPT, for maximized system energy production and revenue, and fast project ROI Superior efficiency (99.5%) Balance of System cost reduction; 50% less cables, fuses, and combiner boxes, and over 2x longer string lengths possible Fast installation with a single bolt Advanced maintenance with module level monitoring Module level voltage shutdown for installer and firefighter safety Use with two PV modules connected in series or in parallel 25 YEAR WARRANTY POWER OPTIMIZER

Page 2

Power Optimizer P605 / P650 / P701 / P730 / P801 Power Optimizer Module (Typical Module Compatibility) P605 (for 1 x high power PV module) P650 (for up to 2 x 60-cell PV modules) P701 (for up to 2 x 60/120-cell PV modules) P730 (for up to 2 x 72-cell PV modules) P801 (for up to 2 x 72/144 cell PV modules) INPUT Rated Input DC Power(1) 605 650 700* 730** 800 W Connection Method Single input for series connected modules Absolute Maximum Input Voltage (Voc at lowest temperature) 65 96 125 Vdc MPPT Operating Range 12.5 – 65 12.5 – 80 12.5 – 105 Vdc Maximum Short Circuit Current per Input (Isc) 14.1 11 11.75 11** 12.5*** Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Capacity II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER Maximum Output Current 15 Adc Maximum Output Voltage 80 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety) RoHS Yes Fire Safety VDE-AR-E2100-712:2013-05 INSTALLATION SPECIFICATIONS Compatible SolarEdge Inverters Three Phase Inverter SE16K & larger Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 153 x 52 / 5.1 x 6 x 2 129 x 153 x 42.5 / 5.1 x 6 x 1.7 129 x 153 x 49.5 / 5.1 x 6 x 1.9 mm / in Weight 1064 / 2.3 834 / 1.8 933 / 2.1 gr / lb Input Connector MC4(2) Input Wire Length 0.16 / 0.52 0.16 / 0.52, 0.9 / 2.95(3) m / ft Output Connector MC4 Output Wire Length Portrait Orientation: 1.4 / 4.5 Portrait Orientation: 1.2 / 3.9 - Portrait Orientation: 1.2 / 3.9 m / ft - Landscape Orientation: 1.8 / 5.9 Landscape Orientation: 2.2 / 7.2 Operating Temperature Range(6) -40 to +85 / -40 to +185 ºC / ºF Protection Rating IP68 / NEMA6P Relative Humidity 0 – 100 % * For P701 models manufactured after work week 06/2020, the rated DC input is 740W. ** For P730 models manufactured after work week 06/2020, the rated DC input is 760W and the maximum Isc per input is 11.75A. *** For P801 models manufactured in work week 40/2020 or earlier, the maximum Isc per input in 11.75A. (1) The rated power of the module at STC will not exceed the Power Optimizer “Rated Input DC Power”. Modules with up to +5% power tolerance are allowed. (2) For other connector types, please contact SolarEdge. (3) Longer input wire lengths are available for use with split junction box modules. For 0.9m/2.95ft order P730-xxxLxxx. (4) For ambient temperatures above +70ºC / +158ºF, power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for more details. PV System Design Using a SolarEdge Inverter(5)(6)(7)(8) 230/400V Grid SE16K, SE17 SE25K*, SE33.3K* 230/400V Grid SE27.6K* 230/400V Grid SE30K* 277/480V Grid SE33.3K*, SE40K* Compatible Power Optimizers P605 P650, P701, P730, P801 P605 P650, P701, P730, P801 P605 P650, P701, P730, P801 P605 P650, P701, P730, P801 Minimum String Length Power Optimizers 14 14 14 14 15 15 14 14 PV Modules 14 27 14 27 15 29 14 27 Maximum String Length Power Optimizers 30 30 30 30 30 30 30 30 PV Modules 30 60 30 60 30 60 30 60 Maximum Continuous Power per String 11250 11625 12750 12750 W Maximum Allowed Connected Power per String(8) (Permitted only when the difference in connected power between strings is 2,000W or less) 13500 13500 15000 15000 W Parallel Strings of Different Lengths or Orientations Yes Maximum Difference in Number of Power Optimizers Allowed Between the Shortest and Longest String Connected to the Same Inverter Unit 5 Power Optimizers * The same rules apply for Synergy units of equivalent power ratings that are part of the modular Synergy Technology Inverter. (5) P650/P701/P730/P801 can be mixed in one string only with P650/P701/P730/P801. P605 cannot be mixed with any other Power Optimizer in the same string. (6) For each string, a Power Optimizer may be connected to a single PV module if 1) each Power Optimizer is connected to a single PV module or 2) it is the only Power Optimizer connected to a single PV module in the string. (7) For SE16K and above, the minimum STC DC connected power should be 11KW. (8) To connect more STC power per string, design your project using SolarEdge Designer.

Page 3

Power Optimizer P800p / P850 / P950 / P1100 Power Optimizer Module (Typical Module Compatibility) P800p (for up to 2 x 96- cell 5’’ PV modules) P850 (for up to 2 x high power or bi-facial modules) P950 (for up to 2 x high power or bi-facial modules) P1100 (for up to 2 x high power or bi-facial modules) Unit INPUT Rated Input DC Power(1) 800 850 950 1100 W Connection Method Dual input for independently connected Single input for series connected modules Absolute Maximum Input Voltage (Voc at lowest temperature) 83 125 Vdc MPPT Operating Range 12.5 – 83 12.5 – 105 Vdc Maximum Short Circuit Current per Input (Isc) 7 14.1* 14.1 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Capacity II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER Maximum Output Current 18 Adc Maximum Output Voltage 80 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety) RoHS Yes Fire Safety VDE-AR-E2100-712:2013-05 INSTALLATION SPECIFICATIONS Compatible SolarEdge Inverters Three Phase Inverter SE16K & larger Three Phase Inverter SE25K & larger Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 168 x 59 / 5.1 x 6.61 x 2.32 129 x 162 x 59 / 5.1 x 6.4 x 2.32 mm / in Weight 1064 / 2.3 gr / lb Input Connector MC4(2) Input Wire Length 0.16 / 0.52 0.16 / 0.52, 0.9 / 2.95, 1.3 / 4.26, 1.6 / 5.24(3) 0.16 / 0.52, 1.3 / 4.26, 1.6 / 5.24(3) 0.16 / 0.52, 1.3 / 4.26(3) m / ft Output Connector MC4 Output Wire Length Portrait Orientation: 1.2 / 3.9 2.4 / 7.8 m / ft Landscape Orientation: 1.8 / 5.9 Landscape Orientation: 2.2 / 7.2 Operating Temperature Range(4) -40 to +85 / -40 to +185 ºC / ºF Protection Rating IP68 / NEMA6P Relative Humidity 0 – 100 % * For P850/P950 models manufactured in work week 06/2020 or earlier, the maximum Isc per input is 12.5A. The manufacture code is indicated in the Power Optimizer's serial number. Example: S/N SJ0620A-xxxxxxxx (work week 06 in 2020) (1) The rated power of the module at STC will not exceed the Power Optimizer “Rated Input DC Power”. Modules with up to +5% power tolerance are allowed. (2) For other connector types, please contact SolarEdge. (3) Longer input wire lengths are available for use with split junction box modules. For 0.9m/2.95ft order P801/P850-xxxLxxx. For 1.3m/2.95ft order P850/P950/P1100 -xxxXxxx. For 1.6m/5.24ft order P850/P950-xxxYxxx). (4) For ambient temperatures above +70ºC / +158ºF, power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for more details. PV System Design Using a SolarEdge Inverter(5)(6)(7)(8) 230/400V Grid SE16K, SE17K 230/400V Grid SE25K* 230/400V Grid SE27.6K* 230/400V Grid SE30K* 230/400V Grid SE33.3K 277/480V Grid SE33.3K*, SE40K* Compatible Power Optimizers P800p, P850, P950 P800p, P850, P950, P1100 P800p, P850, P950, P1100 P800p, P850, P950, P1100 P800p, P850, P950, P1100 P800p, P850, P950, P1100 Minimum String Length Power Optimizers 14 14 14 15 14 14 PV Modules 27 27 27 29 27 27 Maximum String Length Power Optimizers 30 30 30 30 30 30 PV Modules 60 60 60 60 60 60 Maximum Continuous Power per String 13500 13500 13950 15300 13500 15300 W Maximum Allowed Connected Power per String(8) (Permitted only when the difference in connected power between strings is 2,000W or less) 1 string – 15750 1 string – 15750 1 string – 16200 1 string – 17550 2 strings or less – 15750 2 strings or less – 17550 W 2 strings or more – 18500 2 strings or more – 18500 2 strings or more – 18950 2 strings or more – 20300 3 strings or more – 18500 3 strings or more – 20300 Parallel Strings of Different Lengths or Orientations Yes Maximum Difference in Number of Power Optimizers Allowed Between the Shortest and Longest String Connected to the Same Inverter Unit 5 Power Optimizers * The same rules apply for Synergy units of equivalent power ratings that are part of the modular Synergy Technology Inverter. (5) P800p/P850/P950/P1100 can be mixed in one string only with P800p/P850/P950/P1100. (6) For each string, a Power Optimizer may be connected to a single PV module if 1) each Power Optimizer is connected to a single PV module or 2) it is the only Power Optimizer connected to a single PV module in the string. (7) For SE16K and above, the minimum STC DC connected power should be 11KW. (8) To connect more STC power per string, design your project using SolarEdge Designer.

Page 4

solaredge.com SolarEdge is a global leader in smart energy technology. By leveraging world-class engineering capabilities and with a relentless focus on innovation, SolarEdge creates smart energy solutions that power our lives and drive future progress. SolarEdge developed an intelligent inverter solution that changed the way power is harvested and managed in photovoltaic (PV) systems. The SolarEdge DC optimized inverter maximizes power generation while lowering the cost of energy produced by the PV system. Continuing to advance smart energy, SolarEdge addresses a broad range of energy market segments through its PV, storage, EV charging, UPS, and grid services solutions. SolarEdge @SolarEdgePV @SolarEdgePV SolarEdgePV SolarEdge www.solaredge.com/corporate/contact solaredge.com © SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: December 29, 2022 DS-000012-ENG Subject to change without notice. Cautionary Note Regarding Market Data and Industry Forecasts: This brochure may contain market data and industry forecasts from certain third-party sources. This information is based on industry surveys and the preparer’s expertise in the industry and there can be no assurance that any such market data is accurate or that any such industry forecasts will be achieved. Although we have not independently verified the accuracy of such market data and industry forecasts, we believe that the market data is reliable and that the industry forecasts are reasonable.